SECTION 2 - GENERAL
Paint and Appearance
Stamp Inspection Date on Frame
Notify JLG of Machine Ownership
Footnotes:
1
Prior to each sale, lease, or delivery
2
In service for 3 months; Out of service for 3 months or more; Purchased used
3
Annually, no later than 13 months from the date of the prior inspection, Includes all daily and quarterly inspections, mandated by regulating body
50
Indicates a 50 hour interval required to perform task after initial use of machine. This only occurs once in machine life
Performance Codes:
1 - Check for proper and secure: installation, adjustment, or torque
2 - Visual inspection for damage: (cracks, corrosion, abrasions, distortion, excessive wear, broken welds, gouges, chafing and threads showing)
3 - Proper operation
4 - Check for proper sealing, signs of leakage and fluid level
5 - Clean and free of debris
6 - Decals installed and legible
7 - Check for proper tolerances, routing, and lubrication
8 - Fully Charged
9 - Verify/Perform
2-8
Table 2-3. Inspection and Preventive Maintenance Schedule
AREA
Inspections
1
2
Pre-Delivery
or Frequent
(Quarterly)
Inspection
5
-
-
3
Annual
(Yearly)
Inspection
5
9
9
31215019