Download Print this page

Front Runner SSDS201 Manual page 6

Drawer ford ranger

Advertisement

Prepare for installation cont...
(
)
Looking from the front of the Drawer System, loosely secure a D-ring (Item 4) supplied with SSDR010 to
G
the top of each first support pillar using a M6 x 20 Hex Bolt, M6 Spring Nut and M6 x 19 Flat Washer
(Items 5, 6 & 7) supplied with SSDR10 as shown below.
( H )
Working inside the loadbay, just below the wheel arches towards the rear of the vehicle, measure and
mark the load bay either side as indicated below. Drill a 6.5mm hole on each of your markings.
760 mm
REV_A02
Edge of Load Bay
Outer Rib
130 mm
6
Place, Mark & Drill
6.5mm Hole
Outer Rib

Advertisement

loading

This manual is also suitable for:

Ssfr001