Download Print this page

Front Runner SSDS201 Manual page 18

Drawer ford ranger

Advertisement

Install DrawER System
(
)
Lift the Drawer System (Item 1) into the vehicle's load bay and position it 60 mm in from the front of the
A
load bay and center it from left to right.
(
)
Secure the bottom of the Side Wing Assemblies from Step 2A to the Drawer System using four M6 x 20
B
Hex Bolts, four M6 Spring Washers and four M6 Flat Washers (Items 17, 18, 21) received with SSWO001.
When Securing the TOP of the Wing Assemblies, loosely secure a D-ring (Item 4) to the Drawer and Wing
Assembly using a M6 x 20 Hex Bolt, M6 Spring Washer and M6 x 19 Flat Washer (Item 5, 6, 7) received
with SSWO008 as shown.
REV_A02
60 mm
Load Bay
Tail Gate
7

Advertisement

loading

This manual is also suitable for:

Ssfr001