UPS5000-E-(400 kVA-800 kVA)
User Manual (50 kVA Power Modules)
Figure 3-22 Mounting hole dimensions for the 600 kVA UPS (unit: mm)
Step 2 Drill cabinet mounting holes in channel steel by using a hammer drill.
Step 3 Use a pallet truck to move the cabinet to the installation position.
Step 4 Use common M12x60 bolts to secure the cabinets into the mounting holes in the
channel steel and tighten the bolts.
Step 5 Install the front, rear, left, and right anchor baffle plates.
----End
3.2.2 Installing a UPS (800 kVA)
3.2.2.1 Installing the UPS on the Ground
Determining the UPS Installation Position
● Ensure that the installation ground is flat.
● The marking-off template is delivered with the UPS.
Step 1 Determine the cabinet installation positions on the ground based on holes in the
marking-off template for ground installation.
Issue 17 (2023-07-10)
NO TICE
NO TE
● A: mounting holes on the channel steel
● B: mounting holes on the floor
Copyright © Huawei Digital Power Technologies Co., Ltd.
3 Installation
90