Huawei UPS5000-E User Manual page 193

Hide thumbs Also See for UPS5000-E:
Table of Contents

Advertisement

UPS5000-E-(400 kVA-800 kVA)
User Manual (50 kVA Power Modules)
No.
Check Item
3
Heat
dissipation
space
4
Installation
position
5
Ambient
temperature
6
Ambient
humidity
Product Component Checklist
No.
Check Item
1
Installation
Issue 17 (2023-07-10)
Acceptance Criteria
The distance between the
equipment and
surrounding objects meets
the clearance
requirements.
There is no air outlet or
refrigerant copper pipe of
the air conditioner placed
above the equipment, and
no other water leakage
risks exist.
Actual temperature: ______
°C (0–40°C)
Actual humidity: ______%
RH (0%–95% RH, non-
condensing)
Acceptance Criteria
The equipment is installed
properly and arranged
neatly, and screws are
tightened.
Copyright © Huawei Digital Power Technologies Co., Ltd.
Check Method and
Troubleshooting
● Check method:
Measure using a
measuring tape.
● Troubleshooting:
Rectify the fault based
on the acceptance
criteria.
● Check method: visual
inspection
● Troubleshooting:
Rectify the fault based
on the acceptance
criteria.
● Check method:
Measure using a
hygrothermograph.
● Troubleshooting: Check
that the air conditioner
runs properly.
● Check method:
Measure using a
hygrothermograph.
● Troubleshooting: Check
that the air conditioner
runs properly.
Check Method and
Troubleshooting
● Check method: visual
inspection
● Troubleshooting:
Rectify the fault based
on the acceptance
criteria.
6 Routine Maintenance
Check
Interval
Monthly
Monthly
Monthly
Monthly
Check
Interval
Monthly
185