Huawei UPS5000-E User Manual page 6

Hide thumbs Also See for UPS5000-E:
Table of Contents

Advertisement

UPS5000-E-(400 kVA-800 kVA)
User Manual (50 kVA Power Modules)
Contents
2.4.2 Parallel System................................................................................................................................................................... 59
2.4.3 Dual-Bus System................................................................................................................................................................ 59
2.5 Optional Components......................................................................................................................................................... 60
3 Installation..............................................................................................................................62
3.1 Installation Preparations.................................................................................................................................................... 62
3.1.1 Site.......................................................................................................................................................................................... 62
3.1.1.1 UPS Dimensions............................................................................................................................................................. 62
3.1.1.2 Installation Environment............................................................................................................................................. 63
3.1.1.3 Installation Clearances................................................................................................................................................. 64
3.1.2 Tools....................................................................................................................................................................................... 65
3.1.3 Power Cables....................................................................................................................................................................... 69
3.1.4 SPD......................................................................................................................................................................................... 76
3.1.5 Transportation, Unpacking, and Checking................................................................................................................ 76
............................................................................................................................................................................................................ 83
3.2 Installing a Single UPS........................................................................................................................................................ 84
3.2.1 Installing a UPS (400 kVA, 500 kVA, or 600 kVA UPS)........................................................................................ 84
3.2.1.1 Installing the UPS on the Ground............................................................................................................................ 85
3.2.1.2 Installing the UPS on Channel Steel........................................................................................................................89
3.2.2 Installing a UPS (800 kVA).............................................................................................................................................90
3.2.2.1 Installing the UPS on the Ground............................................................................................................................ 90
3.2.2.2 Installing the UPS on Channel Steel..................................................................................................................... 100
3.2.3 Installing Batteries.......................................................................................................................................................... 101
3.2.4 Installing Optional Components................................................................................................................................ 102
3.2.4.1 Installing an IP21 Component.................................................................................................................................102
3.2.4.2 Installing a 4G Module or Network Cable.......................................................................................................... 103
3.2.4.3 Installing T/H Sensors and Cables......................................................................................................................... 105
3.2.4.4 Connecting the BCB Box............................................................................................................................................106
3.2.4.5 Connecting the BBB Box............................................................................................................................................106
3.2.4.6 Installing a Battery Grounding Failure Detector............................................................................................... 107
3.2.4.7 Connecting the iBAT................................................................................................................................................... 108
3.2.5 Cable Routing Requirements...................................................................................................................................... 109
3.2.6 Routing Cables (400 kVA, 500 kVA, or 600 kVA UPS)....................................................................................... 110
3.2.6.1 Top Cable Routing....................................................................................................................................................... 111
3.2.6.2 Bottom Cable Routing............................................................................................................................................... 121
3.2.7 Routing Cables (800 kVA UPS).................................................................................................................................. 127
3.2.7.1 Top Cable Routing....................................................................................................................................................... 128
3.2.7.2 Bottom Cable Routing............................................................................................................................................... 135
3.2.8 Connecting a Remote EPO Switch............................................................................................................................ 143
3.2.9 Connecting Communications Cables........................................................................................................................ 144
3.3 Installing a Parallel System............................................................................................................................................. 144
Issue 17 (2023-07-10)
Copyright © Huawei Digital Power Technologies Co., Ltd.
v

Advertisement

Table of Contents
loading

Table of Contents