● This section describes cable connections when the mains input and bypass
● Determine the cable cross-sectional area and quantity based on the section

3.2.7.1 Top Cable Routing

Context
Route cables for the UPS from inside out and from top down.
Figure 3-68 Power distribution module
(1) Battery input
terminal
Procedure
Step 1 Open the front door of the bypass cabinet and remove the covers of the power
distribution subrack.
Issue 17 (2023-07-10)
NO TICE
input use different power sources. When they use the same power source, there
is no need to remove the copper bars between the mains and bypass input
terminals or connect the bypass input power cables.
"Preparing Power Cables" and site requirements. The figures are for reference
only.
NO TICE
(2) Mains input
terminal
Copyright © Huawei Digital Power Technologies Co., Ltd.
(3) Output terminal
3 Installation
(4) Bypass input
terminal