Fluke Versiv Series User Manual page 205

Cabling certification product family
Hide thumbs Also See for Versiv Series:
Table of Contents

Advertisement

Versiv Series Cabling Certification Product Family
Users Manual
196
Find Quality Products Online at:
PROJECT: The project contains the settings for a job and helps
you monitor the status of a job. When you save test results, the
tester puts them in the project. Tap the PROJECT panel to edit
the project settings, select a different project, or make a new
project.
Shows a summary of the test results in the project:
: The number of tests that passed.
: The number of tests that failed.
The test setup panel shows the settings the tester will use when
you tap TEST or press .
To change these settings, tap the panel, select the test on the
CHANGE TEST screen, tap EDIT, select different settings on the
TEST SETUP screen, then tap SAVE.
You can set up tests for any module that the
tester can use, even when no module is attached.
Next ID: The Next ID panel shows the ID that the tester gives to
the next test results you save.
Tap Next ID to do these tasks:
Enter an ID, select a different ID in the ID set, select a
different set of IDs, or make a new set. The tester adds the
IDs and ID sets you make to the project that shows on the
home screen.
Turn Auto Save on or off.
Select End 1 or End 2 for OTDR and FiberInspector tests.
Enter a name for End 1 and End 2.
Operator: The name of the person who does the job. You can
enter a maximum of 20 operator names. For each operator you
can also enter the email address that the operator will use as an
ID to sign in to LinkWare Live.
GlobalTestSupply
www.
Note
.com
sales@GlobalTestSupply.com

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents