Ceiling Hook Installation; Drop Installation - Chore-Time REVOLUTION 8 Installation And Operator's Manual

Variable brood feeding system
Hide thumbs Also See for REVOLUTION 8:
Table of Contents

Advertisement

REVOLUTION® 8 & 12 Feeder Variable Brood Feeding System
3.Screw the hook into the
truss the full length of the
threads to prevent
bending.
4.The openings of the screw
hooks must be pointed
away from the direction of
travel when the Power
Winch raises the feeder
line. See Figure 14.
Ceiling Hook
Installation
1
4
5.After securing the Ceiling Hook to the truss, slide the hook of a
Swivel Pulley into the slot, as shown in Figure 16.

Drop Installation

Refer to page 12 Figure 14.
1.Attach a 3004 Pulley to each hook.
2.Thread the end of the 3/32" or 1/8" cable through the pulley
toward the winch. Clamp this end to the 3/16" winch cable about 6" [150 mm] from the last pulley, using a 3/
16" cable clamp. See applicable figure; Figure 14 or 17.
3.Allow enough cable length for installation of the Adjustment Leveler.
Sufficient cable is included to provide "throwbacks" on drops located beneath and near the winch. Figure 17
MF2441D
2
4
5
Item
1
Ceiling Hook
2
Steel Truss
3
Wood Truss
4
1/4-20 Lag Screw
5
Cable Travel Direction
6
Weld
Figure 15.Ceiling Hook Installation
Figure 14. Screw Hook Installation
2
6
1
5
Description
Part No.
28550
--
--
--
--
Figure 16. Pulley Installation
Installing the Suspension System
2
3
1
5
4
1
5
13

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the REVOLUTION 8 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Revolution 12

Table of Contents