Circuit Breaker Lockout; Completing The Test - ABB Relion 670 Series Commissioning Manual

Transformer protection
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

Section 11
Testing functionality by secondary injection
A single-phase fault shall be given at the first fault. A three-phase trip must be initiated
for the second fault. Check that the corresponding trip signals appear after both faults.
Functional outputs TRIP, TRLn and TR1P should be active during first fault. No other
outputs should be active. Functional outputs TRIP, all TRLn and TR3P should be active
during second fault.
6.
Initiate a single phase-to-earth fault and switch it off immediately when the trip signal is
generated for the corresponding phase. Initiate the second single-phase-to-earth fault in
one of the remaining phases within the time interval, shorter than
setting 2.0s) and shorter than the dead-time of SMBRREC, when included in the
protection scheme.
Check that the second trip is a three-phase trip and that a three-phase autoreclosing
attempt is given after the three-phase dead time. Functional outputs TRIP, TRLn and
TR1P should be active during first fault. No other outputs should be active. Functional
outputs TRIP, all TRLn and TR3P should be active during second fault.
7.
Initiate a phase-to-phase fault and switch it off immediately when the trip signal is
issued for the corresponding two phases. Initiate a second phase-to-phase fault between
two other phases within the time interval, shorter than
2.0s).
Check, that the output signals, issued for the first fault, correspond to a two- trip for
included phases. The output signals generated by the second fault must correspond to
the three-phase tripping action.
11.12.1.4

Circuit breaker lockout

The following tests should be carried out when the built-in lockout function is used in addition
to possible other tests, which depends on the complete configuration of an IED.
1.
Check that
2.
Activate shortly the set lockout (SETLKOUT) signal in the IED.
3.
Check that the circuit breaker lockout (CLLKOUT) signal is set.
4.
Activate shortly thereafter, the reset lockout (RSTLKOUT) signal in the IED.
5.
Check that the circuit breaker lockout (CLLKOUT) signal is reset.
6.
Initiate a three-phase fault.
A three-phase trip should occur and all trip outputs TRL1, TRL2, TRL3 should be activated.
Functional outputs TRIP and TR3P should be active at each fault. The output CLLKOUT
should not be set.
7.
Activate the automatic lockout function, set
Besides the TRIP outputs, CLLKOUT should be set.
8.
Reset the lockout signal by activating the reset lockout (RSTLKOUT) signal.
9.
Activate the trip signal lockout function, set
All trip outputs (TRL1, TRL2, TRL3) and functional outputs TRIP and TR3P must be active
and stay active after each fault, CLLKOUT should be set.
10.
Reset the lockout.
All functional outputs should reset.
11.
Deactivate the trip signal lockout function, set
lockout function, set
11.12.1.5

Completing the test

continue to test another function or end the test by changing the
Restore connections and settings to their original values, if they were changed for testing
purposes.
238
AutoLock and TripLockout are both set to Off .
AutoLock = Off .
© Copyright 2017 ABB. All rights reserved
tEvolvingFault (default
tEvolvingFault (default setting
AutoLock = On and repeat.
TripLockout = On and repeat.
TripLockout = Off and the automatic
TESTMODE setting to Off .
Transformer protection RET670
1MRK 504 165-UEN E
SEMOD54375-170 v11
SEMOD54375-203 v6
Commissioning manual