Completing The Test; Two Step Overvoltage Protection Ov2Ptov - ABB Relion 670 Series Commissioning Manual

Transformer protection
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

1MRK 504 165-UEN E
For phase-to-earth measurement:
U
1
100
IECEQUATION2430 V1 EN-US
For phase-to-phase measurement:
U
1
100
IECEQUATION2431 V1 EN-US
5.
Increase the measured voltage to rated load conditions.
6.
Check that the START signal resets.
7.
Instantaneously decrease the voltage in one phase to a value about 20% lower than the
measured operate value.
8.
Measure the time delay for the TRIP signal, and compare it with the set value.
9.
Check the inverse time delay by injecting a voltage corresponding to 0.8 × U1<.
( )
t s
IECEQUATION2428 V1 EN-US
where:
t(s)
k1
U
U1<
For example, if the measured voltage jumps from the rated value to 0.8 times the set
start voltage level and time multiplier k1 is set to 0.05 s (default value), then the TR1 and
TRIP signals operate at a time equal to 0.250 s ± tolerance.
10.
The test above can be repeated to check the inverse time characteristic at different
voltage levels.
11.
Repeat the above described steps for Step 2 of the function.
Extended testing
The tests above can be repeated for
11.6.1.2

Completing the test

continue to test another function or end the test by changing the
Restore connections and settings to their original values, if they were changed for testing
purposes.
11.6.2

Two step overvoltage protection OV2PTOV

Prepare the IED for verification of settings as outlined in section
section
Transformer protection RET670
Commissioning manual
UBase VT
sec
<
×
×
VTprim
3
VT
sec
<
UBase
×
×
VTprim
For example, if the inverse time curve A is selected, the trip signals TR1
and TRIP operate after a time corresponding to the equation:
k
1
=
U
1
<
U
1
Operate time in seconds
Settable time multiplier of the function for step 1
Measured voltage
Set start voltage for step 1
"Preparing for test"
in this chapter.
© Copyright 2017 ABB. All rights reserved
2 out of 3 and for 3 out of 3 operation mode.
Testing functionality by secondary injection
(Equation 100)
(Equation 101)
(Equation 102)
TESTMODE setting to Off .
"Requirements"
and
Section 11
M13796-35 v8
M13796-25 v5
M13806-2 v6
191