Repair Support; Maintenance - ABB Relion 670 Series Commissioning Manual

Transformer protection
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

Section 15
Troubleshooting
7.
Pull out the faulty module.
8.
Check that the new module has a correct identity number.
9.
Check that the springs on the card rail are connected to the corresponding metallic area
on the circuit board when the new module is inserted.
10. Reassemble the IED.
If the IED has been calibrated with the system inputs, the calibration procedure must be
performed again to maintain the total system accuracy.
15.4

Repair support

If an IED needs to be repaired, the whole IED must be removed and sent to an ABB Logistic
Center. Before returning the material, an inquiry must be sent to the ABB Logistic Center.
e-mail: offer.selog@se.abb.com
15.5

Maintenance

The IED is self-supervised. No special maintenance is required.
Instructions from the power network company and other maintenance directives valid for
maintenance of the power system must be followed.
272
Remove the IED from the panel if necessary.
Remove the rear plate of the IED.
Remove the front plate.
Remove the screws of the transformer input module, both front and rear.
© Copyright 2017 ABB. All rights reserved
1MRK 504 165-UEN E
M11768-3 v3
M11769-3 v2
Transformer protection RET670
Commissioning manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion ret670

Table of Contents