1.
Apply voltages U-Line equal to 100%
GblBaseSelBus , with a frequency difference equal to 0 mHz and a phase difference lower
than the set value.
2.
Check that the AUTOSYOK and MANSYOK outputs are activated.
3.
Apply voltage to the U-Line equal to 100%
Hz and voltage U-Bus equal to 100%
limit.
4.
Check that the two outputs are not activated. The test can be repeated with different
frequency values to verify that the function operates for values lower than the set ones. If
a modern test set is used, the frequency can be changed continuously.
Testing the reference voltage
1.
Use the same basic test connection as in figure 54.
The voltage difference between the voltage connected to U-Bus and U-Line should be 0%,
so that the AUTOSYOK and MANSYOK outputs are activated first.
2.
Change the U-Line voltage connection to U-Line2 without changing the setting on the
local HMI. Check that the two outputs are not activated.
11.10.1.3

Testing the energizing check

During the test of the energizing check function for a single bay arrangement, these voltage
inputs are used:
U-Line
U-Bus
General
When testing the energizing check function for the applicable bus, arrangement shall be done
for the energizing check functions. The voltage is selected by activation of different inputs in
the voltage selection logic.
Live voltage level is fixed to 80%
The test shall be performed according to the settings for the station. Test the alternatives
below that are applicable.
Testing the dead line live bus (DLLB)
The test should verify that the energizing check function operates for a low voltage on the U-
Line and for a high voltage on the U-Bus. This corresponds to the energizing of a dead line to a
live bus.
1.
Apply a single-phase voltage 100%
voltage 30%
2.
Check that the AUTOENOK and MANENOK outputs are activated after set
respectively
3.
Increase the U-Line to 60%
GblBaseSelBus . The outputs should not be activated.
4.
The test can be repeated with different values on the U-Bus and the U-Line.
Testing the dead bus live line (DBLL)
The test should verify that the energizing check function operates for a low voltage on the U-
Bus and for a high voltage on the U-Line. This corresponds to an energizing of a dead bus to a
live line.
Transformer protection RET670
Commissioning manual
UL1, UL2 or UL3 line1 voltage inputs on the IED
Bus voltage input on the IED
UBase and dead voltage level to fixed 40% UBase .
GblBaseSelLine to the U-Line.
tManEnerg .
GblBaseSelLine and U-Bus to be equal to 100%
© Copyright 2017 ABB. All rights reserved
Testing functionality by secondary injection
GblBaseSelLine and U-Bus equal to 100%
GblBaseSelLine with a frequency equal to 50
GblBaseSelBus , with a frequency outside the set
GblBaseSelBus to the U-Bus, and a single-phase
Section 11
M2377-249 v5
M2377-262 v6
M2377-271 v6
M2377-276 v7
tAutoEnerg
M2377-289 v8
215

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion ret670

Table of Contents