Check Of Voltage Differential Trip And Alarm Levels - ABB Relion 670 Series Commissioning Manual

Transformer protection
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

Section 11
Testing functionality by secondary injection
IEC07000107 V2 EN-US
Figure 52: Connection of the test set to the IED for test of U2 block level
where:
1
2
2.
Apply voltage higher than the highest set value of
three-phase inputs and to one phase of the U2 inputs according to figure 52.
The voltage differential START signal is set.
3.
Decrease slowly the voltage in phase UL3 of the test set until the START signal resets.
4.
Check U2 blocking level by comparing the voltage level at reset with the set undervoltage
blocking
11.6.5.2

Check of voltage differential trip and alarm levels

Procedure
1.
Connect voltages to the IED according to valid connection diagram and figure 53.
196
UL1
UL2
UL3
UN
is three-phase voltage group1 (U1)
is three-phase voltage group2 (U2)
U2Low .
© Copyright 2017 ABB. All rights reserved
UL1
UL2
1
UL3
UN
UL1
2
UL2
UL3
IEC07000107-1-en.vsd
UDTrip , U1Low and U2Low to the U1
Transformer protection RET670
1MRK 504 165-UEN E
SEMOD175258-104 v3
Commissioning manual