Testing functionality by secondary injection
The ActiveGroup menu is located on the PCM600 underMain menu/Test/Function
status/Setting groups/ActiveGroup
3.
Connect the appropriate dc voltage to the corresponding binary input of the IED and
observe the information presented on the local HMI.
The displayed information must always correspond to the activated input.
4.
Check that the corresponding output indicates the active group.
Operating procedures for the PC aided methods of changing the active setting groups
are described in the corresponding PCM600 documents and instructions for the
operators within the SCS are included in the SCS documentation.
11.17.1.2

Completing the test

continue to test another function or end the test by changing the
Restore connections and settings to their original values, if they were changed for testing
purposes.
11.18

Exit test mode

The following procedure is used to return to normal operation.
1.
Navigate to the test mode folder.
2.
Change the
3.
Answer
252
After exiting the IED test mode, make sure that the MU is returned to normal
mode.
On setting to Off . Press the 'E' key and the left arrow key.
YES , press the 'E' key and exit the menus.
© Copyright 2017 ABB. All rights reserved
1MRK 504 165-UEN E
TESTMODE setting to Off .
SEMOD53244-3 v6
Transformer protection RET670
Commissioning manual
M11369-39 v4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion ret670

Table of Contents