ABB Relion 670 Series Commissioning Manual page 145

Transformer protection
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

1MRK 504 165-UEN E
This is done with a speed so that the final impedance is reached after 1 second. As the
injected voltage is lower than 0.92
addition to this the signal ZONE1 should be activated.
5.
Set
Now the signals TRIP1 and TRIP should be activated.
6.
With reduced amplitude of the injected voltage to 0.8
angle is changed via ZC + (ZA – ZC)/2 to a value corresponding to half
between the injected current and voltage.
This is done with a speed so that the final impedance is reached after 1s. As the injected
voltage is lower than 0.92
the signal ZONE2 should be activated.
7.
Set
Now the signals TRIP2 and TRIP should be activated.
Pole slip
impedance
movement
IEC07000099 V2 EN-US
Figure 41: Setting of the pole slip protection PSPPPAM
Transformer protection RET670
Commissioning manual
N1Limit to 1 and repeat step 4.
UBase the START signal should be activated. In addition to this
N2Limit to 1 and repeat step 6.
Zone 1
E
X'
B
d
B
TripAngle
© Copyright 2017 ABB. All rights reserved
UBase the START signal should be activated. In
Zone 2
X
T
IED
jX
ZA
Zone 2
ZC
Zone 1
WarnAngle
f
ZB
Testing functionality by secondary injection
UBase the current amplitude and
IBase and 180°
E
A
Z
S
A
IEC07000099_2_en.vsd
Section 11
R
139

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion ret670

Table of Contents