Installation
3.1 

Site requirements

Consider the following when choosing an installation site for the gas chromatograph (GC):
This GC is designed to operate at temperatures between
-4 and +140 °F (-20 and +60 °C).
Install the GC as close as possible to the sample point, but allow for adequate access
for maintenance tasks and adjustments. Also, install the GC in a way that allows easy
access and viewing of the local operator interface (LOI).
Allow at least 10 in. (254 mm) on the right and left sides of the GC to permit access to
the side portal holes where the field terminations are made.
Allow a minimum of 10 in. (254 mm) above the top of the dome to facilitate access to
the analytical module.
3.2 
Actions upon receiving the gas chromatograph
(GC)
3.2.1 
Unpacking
 WARNING
This device is heavy equipment. Two people are required to move the device.
Failure to observe this warning may cause serious injury to personnel.
Observe all proper lifting methods as defined by your site operating procedures.
The device weighs 50 lb (23 kg) without the sample system. Carefully open and remove the
device from the packing crate.