Assembly/Dismantling Stone And Options; Disassembly Of The Front Side Casing - RIKA PICO Operating Manual

Hide thumbs Also See for PICO:
Table of Contents

Advertisement

Available languages

Available languages

6. ASSEMBLY/DISMANTLING STONE AND OPTIONS

Note
Only work on the unit when the mains plug has been disconnected and the
stove has cooled completely.
Note
During assembly / dismantling do not allow objects (screws etc.) to fall into
the pellet container – they can block the screw conveyor and damage the
stove.
Note
During any conversion work, take particular care of your fingers and any
panels and stove attachments.
Select soft bases to prevent scratches to your living space furniture and
stove panels.

Disassembly of the front side casing

Open the firebox door.
Lift the top panel slightly.
Remove the two knurled screws on the bottom inside of the panel. Turn the
panel carefully under the convection fins.
Rotate the side panel to the front and pull the panel below the convection fins
out.
Lift the lower panel slightly and pull it towards the front.
Open the front and rear flat-head screw, which fastens the left and the right
cover panel.
Note
Watch out to the display wiring when lifting the right cover. Unplug the control
panel before you lift off the right cover panel completely.
Remove the 4 hex screws used to attach the convection fins.
Open the two remaining hex screws (one in front, one in the back), which are
used to fasten the left and right side cover.
Install the removed parts in reverse order.
#3
#8
#8
|13
12

Advertisement

Chapters

Table of Contents
loading

Table of Contents