P/N 3-9008-507
Figure 9-26: Thrust washer and downstream cone installation
7. For NPS 1.5 meter place the thrust washer in the counterbore of the downstream
cone face, polished side out. Place the downstream spring clip, cone end first, into
the downstream end of housing, push the spring clip assembly into the bore
contacting the journal. For NPS 2 and 2.5 meters place the downstream spring clip,
small washer end first, into the downstream end of housing, push the spring clip
assembly into the bore contacting the downstream cone.
Figure 9-27: Downstream spring clip assembly installation
Note
Rotate the downstream spring clip assembly to align the three tubes with the tubes
of the upstream spring clip assembly.
8. Hand-tighten the downstream nut, simultaneously holding the upstream nut to
prevent the shaft from turning.
User manual
USER MANUAL
Planned maintenance
September 2020
93
www.Daniel.com
83

Advertisement

Table of Contents
loading

Related Products for DANIEL 1500 Series

Table of Contents