SERIES 1500 LIQUID TURBINE METER
Planned maintenance
September 2020
9.3.2
Disassemble internal meter housing components - NPS
1.5, 2 and 2.5
Procedure
82
72
www.Daniel.com
Figure 9-6: Shaft removal
A. Downstream cone
B. Upstream cone
Note
The downstream and upstream cones are welded to their respective spring clips
only on NPS 1 and 1.5.
1. Remove downstream shaft nut simultaneously holding upstream shaft nut to
prevent turning.
P/N 3-9008-507
Daniel Series 1500 Liquid Turbine Meter, NPS 1-2.5