Figure 9-22: Shaft installation
3. For NPS 1.5 meter the upstream cone is welded to the upstream clip assembly. For
NPS 2 and 2.5 meters place the thrust washer in the counterbore of the upstream
cone face, polished side out. Place the upstream cone, small diameter end first, on
the downstream end of the shaft. Slide the shaft into the meter, contacting the
downstream end of the upstream spring clip assembly.
Figure 9-23: Upstream cone installation
4. Place the journal on the shaft. Wipe the outside surface with a clean cloth.