SERIES 1500 LIQUID TURBINE METER
Prepare the turbine meter for use
September 2020
4.3.6
LME communication connectivity restrictions
The pickoff input signal connections are made at terminal strip connection TB2 for
Channel A, and TB3 for Channel B. Power supply and output signal connections are made
at terminal strip TB1. Refer to
Important
4.3.7
RME communication connectivity restrictions
The RME must follow all the connectivity restrictions that are applicable to the LME as well
as the transmission distance restrictions listed on
Table 4-4: Installation dimensions for the RME
Device
Pickoff to RME
Preamplifier to receiver
58
54
www.Daniel.com
Table
For single channel wiring use multi-conductor control and instrumentation cable
(18AWG), or equivalent.
Earth ground shield at one end only.
Insulate the shield at the other end.
For dual channel wiring use multi-conductor control and instrumentation cable
(18AWG), or equivalent.
Connect both shields to earth ground at one end of the cables and insulate the shields
at the other end.
The LME housing should be at earth ground.
Transmission distance
6.1 meters (20 ft.) maximum from RME dual channel
1525 meters (5,000 ft.) maximum
2-7,
Table
2-8,
Table 2-9
and
Table
Table
4-4.
Daniel Series 1500 Liquid Turbine Meter, NPS 1-2.5
User manual
P/N 3-9008-507
2-10.

Advertisement

Table of Contents
loading

Related Products for DANIEL 1500 Series

Table of Contents