Download Print this page

Harken MKIII Instruction Manual page 47

Jib reefing & furling systems

Advertisement

Assembly
Norseman/Sta-Lok
and Rod Instructions
®
Secure the lower locking device as described above. To
lock the upper terminal, thread the locking collar UP
until it touches the terminal body, then tighten it firmly
while holding the terminal.
March 1999
After the headstay is tensioned, align the opening
with the furling line lead by turning the line guard
assembly.
Tip: Adjustments can easily be made to the position
of the openings when installing the furling line.
Slide the notched locking washer up the lower stud until
the notches slip over the three pins on the bottom of
the furling unit. It may be necessary to turn the drum
slightly to align the pins with the notches.
Slip the restraining washer up the stud until it rests
against the notched locking washer.
Thread the locking nut up the lower stud and tighten
it against the restraining washer with a
wrench.
Tip: The locking nut is special. Check to see that it is
on the stud with the "up" arrow facing up.
Thread the locking collar down onto the top of the drum
assembly. Tighten with a
holding the swage stud with the Vise-Grips pliers.
Norseman/Sta-Lok
Installation
®
Unit 0 MKIII
/
" (23 mm)
7
8
/
" (23 mm) wrench while
7
8
Rod Installation
24

Advertisement

loading

This manual is also suitable for:

Unit 0