Supplemental Information Only Applicable To Ce/Ukca Machines - JLG EC450AJ Operation & Safety Manual

Table of Contents

Advertisement

General Specifications and Operator Maintenance
2. Tighten nuts in the following sequence:
3. The tightening of the nuts should be done in stages. Following the recommended
sequence, tighten nuts per wheel torque chart.
4. Wheel nuts should be torqued after first 50 hours of operation and after each
wheel removal. Check torque every 3 months or 150 hours of operation.
1st Stage
40 ft. lbs. (55 Nm)
7.6
SUPPLEMENTAL INFORMATION ONLY APPLICABLE TO
CE/UKCA MACHINES
The following information is provided in accordance with the requirements of the
European Machinery Directive 2006/42/EC or Supply of Machinery (Safety) Regulations
2008 No. 1597.
The A-Weighted emission sound pressure level at the work platform is less than 70dB(A).
The vibration total value to which the hand-arm system is subjected does not exceed
2,5 m/s
2
. The highest root mean square value of weighted acceleration to which the
whole body is subjected does not exceed 0,5 m/s
112
Table 9. Wheel Torque Chart
TORQUE SEQUENCE
2nd Stage
95 ft. lbs. (130 Nm)
31219187
170 ft. lbs. (230 Nm)
2
.
3rd Stage
EC450AJ, EC520AJ

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ec520aj

Table of Contents