Alpha ESS SMILE-S6-HV Installation Manual page 26

Energy storage system
Hide thumbs Also See for SMILE-S6-HV:
Table of Contents

Advertisement

ELECTRICAL CONNECTION
Value
*1
Code
SET
SET
Display
*1 ( Step1)
SET
Value
*2 ( Step2)
ESC
2
Display
2. DTSU666-100/40mA: Three-phase meter (with CT)
When the meter is used as Grid meter, please follow the steps below to complete the
address setting by pressing the corresponding button and the number of times.
Value
*1
SET
Code
Display
*1 ( Step1)
SET
Value
*2 ( Step2)
ESC
1
Display
Meter Setting on AlphaCloud
Step 1
When the system work mode is selected as DC, click the button under the "Grid Meter" to
turn the "Meter" in green.
When the system work mode is selected as AC or Hybrid, click the buttons under the
"Grid Meter" and "PV side meter" to turn the "Meter" in green.
Step 2
Click "Save" and wait a few minutes to refresh the page.
When the "Meter Model" displays DTSU666 model, the setting is successful.
NOTE:
It is forbidden to tick CT to modify the CT ratio.
Meter Information
Grid Meter
Meter
CT
Meter CT Ratio
CT
PV side meter
Meter
CT
Meter CT Ratio
CT
SET
*2 ( Step1)
*1
*1
600
601
*1 ( Step2)
SET
*2
*2
*1
SET
*1
0
Addr
701
*1
*1
SET
700
701
SET
*4
( Step1)
*1
( Step2)
*1
*2
SET
0
Addr
Meter Model
Meter Model
46
47
Meter Setting on AlphaAPP
Step 1
When the system work mode is selected as DC, only tick the "Meter" on the right of the
"Grid Meter".
When the system work mode is selected as AC or Hybrid, both tick the "Meter" on the
right of the "Grid Meter" and "PV side meter".
Step 2
Click "Submit" and enter the "System information" page to check the meter model. The
setting is successful if meter model is DTSU666-100/40mA.
NOTE:
It is forbidden to tick CT to modify the CT ratio.
7.4.6 Backup Box & Backup Box-PLUS Connection
NOTICE
The residual current device (RCD) should be connected to the load side.
For Australia safety regulation, the neutral cable of On-Grid side and Back-Up
side must be connected together; otherwise Back-Up function will not work.
ELECTRICAL CONNECTION
Basic Parameter Setting
AC/DG/Hybrid
Hybrid
On Grid PV Capacity(KW)
5
(kW)
Storage PV Capacity(KW)
6
(kW)
Grid Meter
CT
Meter
CT
PV Meter
CT
Meter
CT
Safety Regulations
VDE4105/11.18
Max.Feed-in(%)
100
Submit