Adjust Moistening Level - FP postbase vision Reference Manual

Hide thumbs Also See for postbase vision:
Table of Contents

Advertisement

146
PostBase Vision
16.9.2

Adjust moistening level

With the help of the supplied spacer ring, the moistening level can be adapted to the
letters accordingly. Depending on the position of the spacer ring, moistening of the
envelope flaps can be reduced or increased.
Warning! Electrical hazards due to short circuits.
Be extremely careful when handling the sealant tank and tray to prevent spilling
any fluids. Make sure not to dampen any parts connected to electronics. If this
should happen, immediately pull the power plugs. Have the PostBase Vision
mailing system checked by the Customer Support before using it again.
Spacer ring
FP. "PostBase Vision User Manual (Full Reference Guide)." PostBase Vision Support Semi-Auto, Auto & Advanced, Apr. 2020,
download.fp-usa.com/product_docs/PostBase/Vision/Technical/PostBase_Vision_Reference_Guide_USA_Rev02_20200423.pdf.
• Switch the mailing system off.
• Remove sealant tank out of the housing
3 seconds
At the rear of feeder:
• Carefully pull the sealant tray out to the
Normal moistening
Lug
With this setting, you achieve best results in
most cases.
• Position the spacer ring so that the teeth
Works Cited:
(for further information see chapter 16.9.1
on page 143).
back (see page 148).
are facing down and the lug on the tray is
placed between the guides. The teeth have
to nip into the cut-outs of the tray.

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the postbase vision and is the answer not in the manual?

Table of Contents