• Fill sealer with SEALIT sealing fluid.
• Check the filling level. The sealer should
be filled roughly up to the "max" mark.
• Close the filling opening with the cover.
• If necessary: Dry the sealer outside.
Note: It may take a few minutes for the fluid
to fully prepare the moistening deck and
blade.
Step 4:
Connecting the PostBase Vision
Caution! If the PostBase Vision was previ-
ously in a cold environment (i.e. below 50 °F /
10 °C): Wait at least two hours after unpack-
ing before connecting the postage meter.
The PostBase Vision needs this time to
adapt to the environmental conditions.
Caution! Do not connect the PostBase Vision
Feeder (the optional automatic feeder) until
Step 7. The PostBase Vision postage meter
must be fully installed to do this. Otherwise
the Feeder will not be recognized by the post-
age meter. The mailing system will not work.
Works Cited:
FP. "PostBase Vision User Manual (Full Reference Guide)." PostBase Vision Support Semi-Auto, Auto & Advanced, Apr. 2020,
download.fp-usa.com/product_docs/PostBase/Vision/Technical/PostBase_Vision_Reference_Guide_USA_Rev02_20200423.pdf.

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the postbase vision and is the answer not in the manual?

Table of Contents