Step 2: Assembling The Postbase Vision - FP postbase vision Reference Manual

Hide thumbs Also See for postbase vision:
Table of Contents

Advertisement

22
PostBase Vision

Step 2: Assembling the PostBase Vision

FP. "PostBase Vision User Manual (Full Reference Guide)." PostBase Vision Support Semi-Auto, Auto & Advanced, Apr. 2020,
download.fp-usa.com/product_docs/PostBase/Vision/Technical/PostBase_Vision_Reference_Guide_USA_Rev02_20200423.pdf.
Installation site
The installation site for the PostBase Vision
mailing system must meet the following
requirements:
– Firm, level, low vibration and horizontal
base, which offers sufficient space for the
mailing system in the ordered configuration.
The dimensions of the individual compo-
nents can be found at page 183.
– Room temperature in the range from 59 °F
to 95 °F / 15 °C to 35 °C.
– No direct sunlight.
– Relative humidity within a range of 15 % to
80 %, non-condensing.
– Power outlet in the immediate vicinity.
– Network LAN or Wi-Fi connection with
internet access.
• The PostBase Vision postage meter must
be placed on a suitable surface.
• Remove the protective film from the dis-
play.
Assembling the weighing platform
• Hold the weighing platform as shown in
the illustration and place it onto the scale
receptacle. The long slot in the foot of the
weighing platform must slide in the coun-
terpart on the scale receptacle.
Long slot
Works Cited:

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the postbase vision and is the answer not in the manual?

Table of Contents