SPA/ Ethernet Adapter
Installation and Commissioning Manual

Creating project

You need to start the SPA-ZC 402 Communication Engineering Tool (CET) to open
and name a project, see Fig. 4.3.-1 and Fig. 4.3.-2.
Fig. 4.3.-1 Creating a new CET project
Fig. 4.3.-2 Opening a CET project

Configuring SPA-ZC 402 by using Connectivity Packages

First, you need to install the Connectivity Packages, see Section 3.4. Installing
Connectivity Packages. The IED Connectivity Packages contain needed data and
tools to facilitate the building of an object tree. It is strongly recommended to use
Connectivity Packages to add engineering efficiency.
It is recommended to install the Connectivity Package after
installing the Communication Engineering Tool (CET), see Section
3.3.2. Installing CET. If this is not the case, re-install the
Connectivity Packages after installing the CET, see Section 3.4.
Installing Connectivity Packages.