Creating project

You need to start the Communication Engineering Tool (CET) for
SPA-ZC 40x to open and name a project, see Fig. 6.2.-1 and Fig. 6.2.-2.
Fig. 6.2.-1
Opening a project
Fig. 6.2.-2
Creating a new project

Restarting

Use this function to restart the SPA-ZC 400 at runtime.
1. Select IED and Tools > Reset Tool to open the restart pane, see Fig. 6.3.-1
2. Click Reset.
The results are reported to the UI text box.