Bellfires VIEW BELL XXL 3 CF Installation Instructions & Manual For Maintenance page 39

Gas fi res with closed combustion system
Hide thumbs Also See for VIEW BELL XXL 3 CF:
Table of Contents

Advertisement

Mantle iron (option).
The optional mantle iron is intended for supporting the brickwork above the appliance.
The mantle iron must rest on the brickwork on both sides so that upward building is
possible. Level the mantle iron with the supplied bar set.
First remove the 2 mantle iron transport-spacers "REMOVE"
Note!
Temporarily support the mantle iron, so that it does not fall forwards.
Installation instructions
Mantle iron in combination with the 10 cm
frame (option). The mantle iron is screwed
on the top panel of the 4 sided 10 cm
frame at the factory.
Do not unscrew this connection !
Bar set: • 2x draw bars
English
• 2x tension sleeves
• 2x M6 hooks
• 2x brass expansion
plugs M6
39

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the VIEW BELL XXL 3 CF and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

View bell xxl 3 lf

Table of Contents