Goodrive800 Pro Series Active Rectifier Hardware Manual
No.
6
7
8
9
4.4.1.3 Screw tightening
4.4.2 Electrical installation checklist
No.
Checked the input and output power wiring and ensured
1
the wiring positions and voltages were correct.
Ensured that the input and output power wiring was
2
correct and fastened.
Ensured that the input and output power cable carrying
3
capacity selection was correct.
Ensured that routing the input and output power cables
4
that were shielded complied with EMC regulations.
Checked the external auxiliary power wiring and ensured
5
the wiring positions and voltages are correct.
Routed the control power cables and power cables
6
separately, complying with EMC regulations.
202305 (V1.0)
LCL reactor temperature control detection signal terminal
Fan control signal terminal
Fan power supply terminal
DC pre-buffer terminal
Figure 4-11 Screw installation requirements
NG
The screw is
not fastened.
Operation
Description
Y
The screw is
fastened.
Compliant
Electrical installation
Completed
□
□
□
□
□
□
□
□
□
□
□
□
44
Need help?
Do you have a question about the Goodrive800 Pro Series and is the answer not in the manual?
Questions and answers