Table of Contents

Advertisement

ASSEMBLY

7
Install Reflector: Support and tilt the heater, or use a step-
stool to reach the top of the heater to slide the Reflector
over the 3 studs that are pre-installed in the top of the Head
Assembly B. Then place a Washer GG over each stud and
secure using the 3 Wing Nuts EE. After tightening the Wing
Nuts, return the heater to an upright position.
Hardware Used:
8
Connect the LPG cylinder (Sold separately. Use a
standard 20 lb. propane cylinder only): Lift the Tank
Housing C up and rest it on the top of the assembled
Post Supports H. Screw Regulator E onto the end of
the Gas Hose D. (Do not cross-thread.) Hand-tighten,
then tighten securely with a wrench. Place LPG tank
onto Base of heater, and secure LP tank in place by
hooking Tank Strap G onto the Post Supports. Attach
Regulator to valve on LPG tank. Lower the Tank
Housing.
NOTE: Use this heater only with a propane vapor
withdrawal supply system. See chapter 5 of the ANSI/
NFPA 58 Liquefied Petroleum Gas Code, Standard for
Storage and Handling of Liquefied Petroleum Gas.
Your local library or fire department should have this
book.
Contact us for assistance: (866) 985-7877 | www.balkenehome.com
3 x EE Wing Nut (M8)
3 x GG Washer (M8)
8

Advertisement

Table of Contents
loading

This manual is also suitable for:

6115961436

Table of Contents