11. MOUNTING THE WALL FIXTURE AND CEILING FIXTURE

NOTA
1. Structural analysis must be carried out before mounting the wall or ceiling fixtures!
2. The load-bearing capacity of the structure must be designed, checked and secured
by a structural engineer.
3. The applicable regional building regulations must be observed.
4. In case of incorrect drilling, e.g. by drilling into a reinforcement bar, the responsible
structural engineer must be consulted, as the sufficient static load distribution in
the ceiling may be endangered!
DECLARATION OF ACCEPTANCE
This is to certify that the load-bearing wall/ceiling and anchorage for the MIMLED secure and
load-bearing.
PROJECT
ANCHORING
LOCATION