Eaton 9PXM8S4K User Manual page 57

Table of Contents

Advertisement

2.
If you are rack-mounting the EBM cabinet, refer to the UPS rack-mount installation procedure (see
2.6 Rack-Mount Installation
3.
Install the anchor brackets to the floor if applicable (see
4.
Push in the EBM DC emergency disconnect switch on the rear EBM panel and turn the switch lockout key
(see
Figure 37
).
NOTE
The UPS and EBM AC/DC terminal covers are shipped in the UPS and EBM accessory
kit and do not come installed on the UPS or EBM chassis.
1.
Route the EBM DC input/output cables to the terminal blocks as shown in
NOTE
Torque the screws holding all input and output power conductors to the values specified
in
Table 2
2.
Connect the EBM DC Cables to the applicable terminals by removing and reinstalling the screws onto the
terminal blocks. See
Figure
Figure 38. Standard EBM to UPS Connections
EBM Terminal
Blocks
From previous
DC+
EBM
DC-
(if installed)
Screws
Cover
Terminal
Block
DC input cables from
upstream EBM
(if installed)
). If not, proceed to the next step.
.
38.
DC+
DC-
EBM
DC+ DC- DC- DC+
To UPS
4–20kVA Users Guide P-164000669 4–20kVA Users Guide P-164000669—Rev 10
Standard Battery Cabinet Installation
2.5 Anchor Bracket Installation
(Figure
38).
CN4
UPS/EBM
Terminal
Block
UPS
).
45