Eaton 9PXM8S4K User Manual page 32

Table of Contents

Advertisement

UPS Connections
Figure 18. UPS Input and Output Terminals
Ground
Lug
7.
Route the power cables to the BPM and install conduit adapters to the BPM bottom plate.
8.
Use the label on the top of the BPM access cover and
terminal blocks. Tighten all connections as specified in . Use copper wire that is the appropriate size for the
current draw.
20
4–20kVA Users Guide P-164000669 4–20kVA Users Guide P-164000669—Rev 10
Lug Screws
Terminal
Block
AC Terminal
Blocks
GND
L1 L1
GND
L1
Figure
19, and make the connections to the BPM
L2
N
L2
N
AC Input
Connections
AC Output
Connections

Advertisement

Table of Contents
loading

Table of Contents