Eaton 9PXM8S4K User Manual page 23

Table of Contents

Advertisement

Figure 8. Moving the UPS from the Pallet
NOTE
6.
Level the cabinet at its operating location by extending the four leveling feet.
7.
If you are installing the floor anchors and they are not already installed, see
" in the next section to install the floor anchor brackets.
8.
If you are installing an external battery cabinet, continue to
5.1 Battery Cabinet
9.
Continue to
as applicable.
2 2 . . 5 5
A A n n c c h h o o r r B B r r a a c c k k e e t t I I n n s s t t a a l l l l a a t t i i o o n n
NOTE
The Eaton 9PXM UPS cabinet is shipped with four anchor (stabilizer) brackets (Kit P-157002300). These
brackets must be attached to the floor. Under all module-loading conditions, they act as a protective stop to
prevent the cabinet from falling forward if it is unintentionally pushed.
Each bracket has holes that enable it to be attached by screws to the floor (see
are attached to the cabinet base itself.
To install the stabilizer brackets:
Pallet Front
For ease of installation, determine if you have sufficient clearance at the rear of the UPS
to complete the electrical connections before securing the UPS in its final position (see
3.1 Installation of the UPS with an External Bypass Switch
4.2 UPS Electrical
Installation".
Options" .
"3.1 Installation of the UPS with an External Bypass Switch
For ease of installation, complete the rear electrical connections before securing the
anchor brackets to the floor. See or
4–20kVA Users Guide P-164000669 4–20kVA Users Guide P-164000669—Rev 10
Screws
Pallet
Bracket
Pallet Rear
"5.2 Standard Battery Cabinet Installation
4.2 UPS Electrical Installation
Anchor Bracket Installation
Ramp
Ramp
or
"2.5 Anchor Bracket Installation
or
4.2 UPS Electrical Installation
.
Figure 9
). The anchor brackets
or
".
11

Advertisement

Table of Contents
loading

Table of Contents