Unpackaging The Charging Station; Report Missing Delivery Components Or Transport Damage - Siemens SICHARGE UC 150 Operating Instructions Manual

Hide thumbs Also See for SICHARGE UC 150:
Table of Contents

Advertisement

Preparing for use
4.1 Checking incoming goods
Perform a visual inspection of the shock indicator as follows:
1. Check whether there is a shock indicator on the transport packaging.
2. Check whether the glass tube in the middle of the indicator has turned red.
3. Report any red colored or missing indicator to the carrier immediately.
The carrier must confirm the red colored or missing indicator on the receipt.
Check the overall transport packaging
After you have checked the shock indicator, continue checking the incoming goods with the
visual inspection of the overall transport packaging.
4.1.3

Unpackaging the charging station

Depending on the transport route, the forwarding agent delivers the charging station in
different transport packaging.
Removing packaging for road transport
To remove the packaging, proceed as follows:
1. Remove the transport film.
2. Remove the edge protection strips.
3. Remove the spacers.
Remove packaging for air transport
To remove the packaging, proceed as follows:
1. Remove the screws from the side panel of the packaging.
2. Take off the side panel.
3. Remove the cover of the transport packaging.
Remove the packaging for sea transport
To remove the packaging, proceed as follows:
1. Remove the aluminum compound foil.
2. Remove the screws from the side panel of the packaging.
3. Take off the side panel.
4. Remove the cover of the transport packaging.
4.1.4

Report missing delivery components or transport damage

If you discover that the delivery is incomplete or that there is transport damage, document
the damage first. Then submit a damage report.
28
Operating Instructions, 10/2022, A5E50068475-AB
SICHARGE UC 150

Advertisement

Table of Contents
loading

Table of Contents