Siemens SICHARGE UC 150 Operating Instructions Manual page 59

Hide thumbs Also See for SICHARGE UC 150:
Table of Contents

Advertisement

Commissioning
7.1 Initial commissioning
Software verification
The service technician verifies and updates the versions of the following components as
needed during initial commissioning:
• Linux Siemens Charger Controller (SiCC)
• Supply Equipment Communication Controller (SECC)
• AC platform
• Output platform
• Fan control platform
• DSP platform
Verification of electrical functionality
The service technician checks the following components and functions during initial
commissioning:
• DC shutdown switch
– Press the DC shutdown switch
– Alarm message on HMI indicates DC shutdown switch actuation
– Unlock the DC shutdown switch
– Alarm message on HMI is automatically reset
• Check the functionality of AC contactors and DC contactors and the feedback of the
contactors on the HMI (optional)
Checking the charging session
NOTE
A vehicle with low SoC (< 60 %) must be available to proceed with this device.
You need to connect your laptop to the charging station to proceed with this device.
60
Operating Instructions, 10/2022, A5E50068475-AB
SICHARGE UC 150

Advertisement

Table of Contents
loading

Table of Contents