Stratasys H350 User Manual page 234

A saf selective absorption fusion powered product
Table of Contents

Advertisement

Post-Build Maintenance
2. Lower the build plate fully by accessing the Service operations screen and pressing the
Build plate slider until build plate is at its lowest position. See
Figure 75: Service operations screen for lowering build plate and parking distribution sled
3. Once the print sled has moved to the center, press Module Test | Sleds | Print sled. See
Figure
a. Press Lamp left. The software turns on IR lamp #3 for 10 seconds.
76.
© Copyright 2022 Stratasys. All rights reserved.
Cleaning Infrared (IR) Lamps #1, #2, and #3
Figure
71.
Page 222

Advertisement

Table of Contents
loading

Table of Contents