Stratasys H350 User Manual page 136

A saf selective absorption fusion powered product
Table of Contents

Advertisement

Basic Job Build Tasks
Starting a Build Job (Select From List)
8. After heatup is completed, the build job begins. The first stage is pre-build. During this
phase, 500 layers of power are placed on the build bed. During this phase, the estimated
time to build completion can also be viewed.
Figure 28: Pre-build
Page 124
© Copyright 2022 Stratasys. All rights reserved.

Advertisement

Table of Contents
loading

Table of Contents