Stratasys H350 User Manual page 138

A saf selective absorption fusion powered product
Table of Contents

Advertisement

Basic Job Build Tasks
Starting a Build Job (Select From List)
The primary graphic on the build page provides a counter with the number of the current layer
being printed.
Figure 30: Current layer
When the build is complete, 20 additional layers of powder are added on top of the build job.
Page 126
© Copyright 2022 Stratasys. All rights reserved.

Advertisement

Table of Contents
loading

Table of Contents