Stratasys H350 User Manual page 232

A saf selective absorption fusion powered product
Table of Contents

Advertisement

Post-Build Maintenance
Cleaning Infrared (IR) Lamps #1, #2, and #3
Figure 73: Sled module test screen
e. When both lamps have been lit once for 10 seconds, move the distribution sled back to
the park position by pressing Common operations at the top of the operations list and
then Left park. See
Figure
71.
Page 220
© Copyright 2022 Stratasys. All rights reserved.

Advertisement

Table of Contents
loading

Table of Contents