Inspections And Commissioning Test - Bartscher Silversteam-K 6110DRS Manual

Table of Contents

Advertisement

Installation Instructions
Potential Equalising Connection
The potential equalising connection between various appliances should be
executed at the connection clamp, marked with
The connection clamp is found at the back of the appliance.
This clamp renders it possible to connect a potential equalising cord with section
of at least 10 mm².
5.2

Inspections and Commissioning Test

Inspections Prior to Start-up
Before the first start-up, electric appliances must be thoroughly inspected in order to
confirm the consistency of the appliance and its installation with regulations in force,
technical data, and recommendations for safety.
The following conditions must be met:
– Temperature in the installation location must exceed +4°C.
– The thermal processing chamber must be empty.
– All packaging elements must be fully removed, including the protective
film on external walls.
– Ventilation openings cannot be covered nor obstructed.
– Parts disassembled during installation of the appliance must be re-
assembled.
– The main switch of the electric installation must be on, and water shut-off
valve upstream of the appliance must be open.
117262
symbol.
EN
23 / 70