Part 2 - Initial Configuration On Each Orchestrator - Quantum CHECK POINT MAESTRO ORCHESTRATOR 1U Getting Started Manual

Hide thumbs Also See for CHECK POINT MAESTRO ORCHESTRATOR 1U:
Table of Contents

Advertisement

5. Connect the required cables between the applicable Uplink ports 5 - 26, 49 - 55 on each Orchestrator
and your switches.
More information
Important - To connect Fiber cables, you must use only the supported
transceivers. See
appliances.
See:
"Port Mapping for the Quantum Maestro Orchestrator MHO-140" on page 20
n
"Connecting to the Uplink Ports with DAC or Fiber Cables" on page 61
n
"Connecting to the Uplink Ports with Breakout Cables" on page 63
n
Port Speed
on a Switch
10 Gbps
40 Gbps
100 Gbps
6. Power on each Orchestrator.
See
"Step 7: Initial Power On" on page 40
Part 2 - Initial Configuration on each
Orchestrator
Note - It is important in which order you configure the Orchestrators.
The first Orchestrator you configure becomes the "first" Orchestrator on this Site.
It synchronizes the configuration to the "second" Orchestrator on this Site.
Procedure
1. Connect the included Ethernet cable from your computer to the MGMT port labeled
panel of the Orchestrator #1.
See
"MHO-140 Rear Panel" on page 24
You use this MGMT port only to manage the Orchestrator.
Getting Started with MHO-140 - Single Site with Two Orchestrators
sk92755 - Compatibility of transceivers for Check Point
Port Type on the
Cable to Use
Orchestrator
SFP+ / SFP28
Fiber or DAC
Ports 5 - 26
QSFP / QSFP28
Fiber, DAC, or Breakout
Ports 49 - 55
QSFP / QSFP28
Fiber, DAC, or Breakout
Ports 49 - 55
.
.
Quantum Maestro Getting Started Guide      |      12
0
on the rear

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mho-175Mho-170Mho-140

Table of Contents