2.7 INSTALLATION

This section discusses the installation procedures for wall-mounted and pedestal-
mounted cabinets and charger modules, as well as pogo stick cable mounts and
stack lights.
2.7.1 WALL MOUNT
Based on the planning you performed in Section 2.4, you are now ready to begin
installation. If you are installing multiple chargers, remember the clearances
required, and then begin your installations starting with the left-most unit;
this leaves adequate space for installing the charger module(s) without any
interference.
The wall mount kit (no pogo), (
length, a lower strut channel of 36" length and four pairs of spring clamping nuts
and machine screws for fastening the cabinets to the strut channels.
1. Drill the holes as described in Section 2.4 for either cinder block,
dry wall with wooden studs, or dry wall with strengthened metal
studs. Mount the strut channels with fasteners appropriate for the
wall material.
2. Next, mount the cabinets (you may need a helper) to the strut
channels by inserting a spring clamping nut in the channel behind
a cabinet mounting hole, then insert the machine screw through
the hole and into the clamping nut. Tighten appropriately.
3. Repeat for remaining mounting holes.
2.7.2 PEDESTAL MOUNT
Refer to Figure 7. The pedestal mount is shipped with the horizontal mounting
arms in place. Holes for mounting the Procore chargers on to the arms are pre-
drilled and face forward. The kit includes all hardware for mounting the pedestal
to the concrete floor and for securing the chargers to the pedestal arms.
The pedestal foot measures exactly 12 inches square, and the holes are set on an
11 inch square. Determine the location(s) for your pedestal(s), then complete the
following steps.
1. Using standard industry practice, drill holes in the concrete
to accommodate a concrete anchor wedge stud. The stud is a
3/8"x16x5", with a 3.125 thread length. When the holes are drilled,
insert the studs.
2. Mount the pedestal on the studs, then place a flat washer over
each stud and secure with a hex nut. Tighten the nut to secure
each stud firmly in the concrete.
3. Mount the cabinet over the forward-facing holes in the support
tubing (you may need a helper).
4. Insert a flange head machine cap screw (included with the kit)
through the holes, place a flat washer over the screw inside the
tubing, then secure the screw with a hex nut.
5. Repeat for the remaining mounting holes.
6. When complete, insert a square black tubing plug into the top of
the pedestal and into the ends of the horizontal tubing.
12
P/N
# 24889) provides an upper strut channel of 24"