3. Use the crimp terminals (P/N# 05358) to splice the RED, YELLOW,
VIOLET and BLACK wires to the stack light lead wires, as shown in
Figure 11.
4. Insulate unused wires with heat shrink tubing (P/N# 02422).
5. Install four cable tie mounts (P/N# 03484) at the locations shown in
Figure 10, then secure the wiring with the included cable ties.
6. Connect stack light wires to the TB1 terminal block on the
backplane board according to Table 2. Terminals are numbered
left-to-right.
Figure 9:Top Cabinet Stack Light Mounting Holes
A
2.50
2.25
Figure 10: Stack Light Mounting Position and Dimensions
FROM STACK LIGHT
BLACK WIRE
RED WIRE
YELLOW WIRE
VIOLET WIRE
14
FRONT
Table 2: Stack Light Wiring
.875
4X
1.103
2.205
DETAIL A
SCALE 1 : 2
TO TB1 TERMINALS
TB1-5
TB1-6
TB1-7
TB1-8
2.205
1.103
.213