Figure 4 above shows a rack mount, also using Unistruts.
2.4.2 PEDESTAL MOUNT
ProCore chargers may also be mounted on pedestals, where each pedestal can
accommodate two charger cabinets. Pedestals require only that they be mounted
on flat concrete floors with enough physical clearance for safe vehicle operation
and personnel safety. Pedestal mount installation is described in Section 2.7.2.

2.5 UNPACKING THE PRODUCT

Before opening the boxes, inspect the box for signs of any damage that may have
occurred during shipping and, if so, contact the shipper immediately to file a
claim.
Use a box knife set to the first notch to minimize the risk of damaging the cabinet
or the modules when slicing the shipping tape. Carefully remove the box contents
and set aside in a secure location free from dust and moisture prior to installation.
Do not dispose of the shipping containers until installation and testing are
complete.
10
Figure 4: Rack Mount
Do NOT mount to walls with steel studs and drywall
covering if the steel studs are not structurally rated.
In Figures 3 and 4 above, the object next to the cabinet
(called a "Pogo Stick") is a spring-loaded cable support
and retractor that keeps the cables off the floor. It allows
the cables to be extended to reach a fork truck parked
farther away from the charger. It is an optional item.
Ensure that all shipping materials are removed from
inside the cabinet.