Commissioning
4.6 Extended Safety
4.6.2.13
Starting communication via PROFIsafe
When you connect the inverter to the central controller via the fieldbus for the first time, the
central controller sends the PROFIsafe configuration to the inverter. Once the configuration
data has been received, the inverter interconnects its internal signals with the PROFIsafe
telegram.
Note
Monitoring PROFIsafe communication
The inverter monitors communication with the central controller. The inverter does not start
monitoring communication until the configuration data has been received from the central
controller.
4.6.2.14
Further steps
● Commission the standard inverter functions by following the operating instructions. The
● Perform an acceptance test for the safety functions:
146
link to the operating instructions can be found in the section Manuals for your inverter
(Page 229).
– Document your settings in an acceptance report.
– Check whether the safety functions are functioning correctly in your application.
– The instructions for the acceptance test can be found in the section Acceptance test -
Completion of commissioning (Page 164).