Verify Operation - Keysight X Series Installation Notes

Signal analyzer
Hide thumbs Also See for X Series:
Table of Contents

Advertisement

Top Brace Installation
15.Referring to
Figure
three panhead screws (2). Torque all screws to 9 in-lbs.
Figure 22
Top Brace Installation

Verify Operation

The operation of the power supply should be verified before installing the instrument dress cover.
1. Connect the AC mains to the instrument and turn it on.
2. Verify that the cooling fans come right on and that the instrument boots up properly.
3. Turn the instrument off and remove the AC mains.
Installation Note N9042-90012
22, install the top brace (3) using the fourteen new flat screws (1) and the
Upgrade Instructions
29

Advertisement

Table of Contents
loading

This manual is also suitable for:

N9042b

Table of Contents